Bonneville Power Administration (BPA) proposes to perform maintenance and in-kind upgrades to improve substation reliability at the existing BPA Sn…
This project will investigate, deploy, and demonstrate the synergistic value of two types of Grid Enhancing Technologies (GETs): (i) DLR (SUMO), (i…
Install field sensors on existing utility poles. Develop a software tool that processes data from installed sensors and will be demonstrated in a u…
Bonneville Power Administration (BPA) proposes to replace equipment at BPA’s existing Rocky Reach Substation in Douglas County, Washington. The pro…
Bonneville Power Administration (BPA) proposes to remove, replace, upgrade, and/or modify outdated equipment at Chief Joseph Substation and to repl…
This revision includes new locations for field testing. National and Homeland Security (N and HS) Wireless Testbed (WTB) would like to add addition…
The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…
The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…
The Bonneville Power Administration (BPA) proposes to install wiring for telemetry equipment in BPA’s Snohomish Substation and perform associated p…
Recipient is proposing a Smart Grid Manhole and Vault Monitoring Project (MVMP) to enhance smart grid deployment and improve resiliency within the …