The Department of Energy Loan Programs Office is considering whether to issue a Title XVII Energy Infrastructure Reinvestment Program loan guarantee to Wisconsin Power and Light for the Grant County Battery Energy Storage System Project.
Provide a network of grid-edge devices (for sub-metering and load control) at the customer/distribution level to provide flexible load management i…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the City of Stanta Clara for the design and ins…
Install Load Bank at TEF for 254-21 Diesel Generator.…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to Lincoln County Power District (LCPD) to develop…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the City of Ellensburg Public Works and Utiliti…
Assembling a laboratory test platform for pipeline process simulation. Cybersecurity course development. Excavation training of students and indust…
Bonneville Power Administration (BPA) proposes to replace the batteries and related hardware and equipment located within an existing equipment bui…
Deploy grid enhancing technologies (GETs), dynamic line ratings (DLR) and edge computing devices (ECD), in the Recipient’s electric service territo…
Remove and upgrade the existing Audio/Video equipment in MGN-B39-104 and MGN B39-415. The intent is to only replace mostly in place the existing eq…