Install 200,000 edge computing sensors, Install 22,500 2-way load control switches/sensors, Install 100 miles of fiber optic cable, education and …
Remove disconnected legacy electrical components on a small pad south of 190-K.…
Installation of a 3 MW, 12 MWH battery energy storage system (BESS), pole replacement, FLISR device installation, and fiber-ethernet switch install…
The U.S. Department of Energy (DOE) Solar Energy Technologies Office (SETO) and Wind Energy Technologies Office (WETO) issued the “Solar Technologi…
Planned activities include accelerating dynamic line rating industry research and development by deploying a limited quantity of small sensors on e…
Bonneville Power Administration (BPA) proposes to conduct activities listed below to operate and maintain high voltage electrical facilities throug…
The Recipient will improve grid resilience by hardening grid elements, adding weather stations, removing hazards, under-grounding lines, improving …
The Bonneville Power Administration (BPA) proposes to install wiring for telemetry equipment in BPA’s Murray Substation and perform associated prog…
The Bonneville Power Administration (BPA) proposes to make updates to physical security systems to meet current North American Electric Reliability…
Several buildings at NRF will need to be modified in order to establish the VTRs. The modifications include replacing access doors, installing electrical and communication infrastructure, installing vestibules outside of select buildings, and installing secure lockers to store portable electronic devices.