The Recipient will improve grid resilience by hardening grid elements, adding weather stations, removing hazards, under-grounding lines, improving …
The Bonneville Power Administration (BPA) proposes to install wiring for telemetry equipment in BPA’s Murray Substation and perform associated prog…
The Bonneville Power Administration (BPA) proposes to make updates to physical security systems to meet current North American Electric Reliability…
Several buildings at NRF will need to be modified in order to establish the VTRs. The modifications include replacing access doors, installing electrical and communication infrastructure, installing vestibules outside of select buildings, and installing secure lockers to store portable electronic devices.
The Department of Energy Loan Programs Office is considering whether to issue a Title XVII Energy Infrastructure Reinvestment Program loan guarantee to Wisconsin Power and Light for the Grant County Battery Energy Storage System Project.
Provide a network of grid-edge devices (for sub-metering and load control) at the customer/distribution level to provide flexible load management i…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the City of Stanta Clara for the design and ins…
Install Load Bank at TEF for 254-21 Diesel Generator.…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to Lincoln County Power District (LCPD) to develop…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the City of Ellensburg Public Works and Utiliti…