Install the ADA technology to Duke Buck Station power plant. The plan involves connecting a computing device into the plant operational technology …
CX-034839: LCRA Sim Gideon (Power Generation Facility) Comprehensive Control and Monitoring Upgrades
Sub-recipient will Upgrade AVR with Power System Stabilizer, remove and replace disturbance monitoring equipment, install real-time vibration monit…
Sub-recipient will construct scaffolding, remove existing assemblies, demolish existing pipe and enclosure insulation assemblies and remove existin…
Bonneville Power Administration (BPA) proposes to connect BPA's 230-kilovolt (kV) Grand Coulee-Bell No. 5 transmission line to Avista Corporation's…
Disconnect Electrical from Crane, K-Area, and Install Junction Box…
Recipient will deploy the DLR technology (WireWarrior sensors) using drone and integrate DLR data into a simulated grid operations and scheduling e…
Bonneville Power Administration (BPA) proposes to allow the City of Milton (City) to replace and install cabling and other electronic equipment at …
The proposed action would replace a portion of the existing overhead electrical power and fiber optic telecommunication poles and cables with buried cables along an approximately 3,583 feet long corridor extending from near the summit of Rattlesnake Mountain and downslope to the southeast.
KEM Electric Cooperative plans to replace protective devices within existing substation fences and at existing wood pole locations in existing util…
The project will involve the deployment of a thermal energy storage (TES) system to enhance the resilience of the tribal community in Nevada. The p…