The project includes the design, construction, and deployment of a SCADA system for power generation facilities and substations. Activities will in…
The installation of status and wireless control of distribution system equipment including the installation of advanced metering infrastructure for…
Install the ADA technology to Duke Buck Station power plant. The plan involves connecting a computing device into the plant operational technology …
CX-034839: LCRA Sim Gideon (Power Generation Facility) Comprehensive Control and Monitoring Upgrades
Sub-recipient will Upgrade AVR with Power System Stabilizer, remove and replace disturbance monitoring equipment, install real-time vibration monit…
Sub-recipient will construct scaffolding, remove existing assemblies, demolish existing pipe and enclosure insulation assemblies and remove existin…
Bonneville Power Administration (BPA) proposes to connect BPA's 230-kilovolt (kV) Grand Coulee-Bell No. 5 transmission line to Avista Corporation's…
Disconnect Electrical from Crane, K-Area, and Install Junction Box…
Recipient will deploy the DLR technology (WireWarrior sensors) using drone and integrate DLR data into a simulated grid operations and scheduling e…
Bonneville Power Administration (BPA) proposes to allow the City of Milton (City) to replace and install cabling and other electronic equipment at …
KEM Electric Cooperative plans to replace protective devices within existing substation fences and at existing wood pole locations in existing util…