Mount a cabinet to the existing structure and install communication wiring/ conduit within the existing substation rock footprint (12 substations).…
Office of NEPA Policy and Compliance
April 14, 2026Mount a cabinet to the existing structure and install communication wiring/ conduit within the existing substation rock footprint (12 substations).