Project Number BH-09-080 - Big Hill Buildings 802 and 812 Damage InspectionCX(s) Applied: B1.3Date: 01/07/2010Location(s): TexasOffice(s): Fossil Energy, Strategic Petroleum Reserve Field Office
Project Number BM-09-111 - Provide Clear Zone Around Bryan MoundCX(s) Applied: B1.3Date: 01/07/2010Location(s): TexasOffice(s): Fossil Energy, Strategic Petroleum Reserve Field Office
Emergency Flowline Repair 78-SX-24 and 68-66-SX-34CX(s) Applied: B1.3, B5.6Date: 01/06/2010Location(s): Casper, WyomingOffice(s): RMOTC
Building 9204-2E Vacuum System Upgrade (4489)CX(s) Applied: B1.3, B2.2Date: 01/05/2010Location(s): Oak Ridge, TennesseeOffice(s): Y-12 Site Office
Chiller Booster Pumps (4487)CX(s) Applied: B1.3, B2.2Date: 01/05/2010Location(s): Oak Ridge, TennesseeOffice(s): Y-12 Site Office
Miller Picking Air Handling Unit (AHU) Replacement (4488)CX(s) Applied: B1.3, B2.2Date: 01/05/2010Location(s): Oak Ridge, TennesseeOffice(s): Y-12 Site Office
MotoMesh Deployment Phase II (4486)CX(s) Applied: B1.3, B2.2Date: 01/05/2010Location(s): Oak Ridge, TennesseeOffice(s): Y-12 Site Office
Connecticut - State Building Energy Improvements: 79 Elm StreetCX(s) Applied: B1.3, B1.4, B1.24, B1.31, B2.5, B5.1Date: 01/05/2010Location(s): Hartford, ConnecticutOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
Isolate 185-3K Cooling Tower Fire Water Leg from Area Firewater LoopCX(s) Applied: B1.3Date: 01/05/2010Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Utility and Electrical System Optimization CX(s) Applied: B1.3, B1.27, B2.1, B2.2, B2.3, B2.5Date: 01/01/2010 Location(s): OhioOffices(s): Portsmouth Paducah Project Office