Bridgeport-Gering 115-Kilovolt Transmission Line Structure Replacement CX(s) Applied: B1.3 Date: 09/12/2013 Location(s): Nebraska, Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region
Office of NEPA Policy and Compliance
September 12, 2013Bridgeport-Gering 115-Kilovolt Transmission Line Structure Replacement
CX(s) Applied: B1.3
Date: 09/12/2013
Location(s): Nebraska, Nebraska
Offices(s): Western Area Power Administration-Rocky Mountain Region
Western Area Power Administration proposes to replace two rejected wood pole structures, 326 and 527, on its Bridgeport-Gering 115-kilovolt Transmission Line. Structure 326 is located in Morrill County. Structure 527 is located in Scottsbluff County.
CX(s) Applied: B1.3
Date: 09/12/2013
Location(s): Nebraska, Nebraska
Offices(s): Western Area Power Administration-Rocky Mountain Region
Western Area Power Administration proposes to replace two rejected wood pole structures, 326 and 527, on its Bridgeport-Gering 115-kilovolt Transmission Line. Structure 326 is located in Morrill County. Structure 527 is located in Scottsbluff County.