Routine Maintenance Activities at the Grand Junction, Colorado, Calibration Model Facility CX(s) Applied: B1.3, B1.24 Date: 12/13/2011 Location(s): Colorado Offices(s): Legacy Management
Record of Categorical Exclusion for Repair Erosion Problems at Big Hill Raw Water Intake Structure CX(s) Applied: B1.3 Date: 12/05/2011 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
McNary-Horse Heaven 230-kilovolt Transmission Line Raise (Structures 15/2 to 16/3) CX(s) Applied: B1.3 Date: 12/01/2011 Location(s): Washington Offices(s): Bonneville Power Administration
Ashe-Marion #2 Spacer Replacements CX(s) Applied: B1.3 Date: 11/29/2011 Location(s): Oregon, Oregon, Washington, Oregon, Oregon Offices(s): Bonneville Power Administration
Record of Categorical Exclusion for Tear Down, Inspect and Repair Bayou Choctaw Brine Filters at BDW Pad 1 CX(s) Applied: B1.3 Date: 11/29/2011 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Idaho National Laboratory Asphalt Repair Project - North Wind Services, LLC CX(s) Applied: B1.3 Date: 11/28/2011 Location(s): Idaho Offices(s): Nuclear Energy, Idaho Operations Office
Install Universal Wiring in Buildings 735-A, 735-4A, 735-7A, & 735-11A CX(s) Applied: B1.3 Date: 11/28/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Minor Road and Utility Operations CX(s) Applied: B1.3, B1.7, B1.13, B1.32, B4.7 Date: 11/28/2011 Location(s): Washington Offices(s): Science, Pacific Northwest Site Office
Record of Categorical Exclusion for Use of RW Surge Line to Big Hill Anhydrite Pond for Raw Water Intake Structure Recycle CX(s) Applied: B1.3 Date: 11/28/2011 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Record of Categorical Exclusion for Inspection and Repair of West Hackberry-SUN 42-inch Crude Oil Pipeline CX(s) Applied: B1.3 Date: 11/28/2011 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office