Subcontractor Repair of Roof Leaks at 773-A CX(s) Applied: B1.3 Date: 08/20/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Roadway Rights-of-way Maintenance CX(s) Applied: B1.3 Date: 08/20/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Sheep's Knob Communication Site Road Maintenance CX(s) Applied: B1.3 Date: 08/20/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
2013 Ross Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 08/19/2013 Location(s): Washington, Washington, Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration
Clean and Inspect West Hackberry T-15 Brine Tank CX(s) Applied: B1.3 Date: 08/19/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor Repair of Roof Leaks at the South End of 722-4A CX(s) Applied: B1.3 Date: 08/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof at 773-51A CX(s) Applied: B1.3 Date: 08/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 730-2B CX(s) Applied: B1.3 Date: 08/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Ault-Craig 345-Kilovolt WCMO Danger Tree Management CX(s) Applied: B1.3 Date: 08/14/2013 Location(s): Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Big Eddy-Redmond No.1 Wood Pole Replacement Project CX(s) Applied: B1.3 Date: 08/14/2013 Location(s): Oregon Offices(s): Bonneville Power Administration