Fire Pumps Replacement at the K-Area Complex CX(s) Applied: B1.3 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Prepare and Seal Exterior of Dry Room, Building 735-A CX(s) Applied: B1.3 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Install Six Groundwater Monitoring Wells and Perform General Site Actions at the Bluewater Uranium Mill Tailings Radiation Control Act Site Near Grants, New Mexico CX(s) Applied: B1.3, B3.1 Date: 05/16/2012 Location(s): New Mexico Offices(s): Legacy M...
Dry Pipe Sprinkler Piping Replacement Projects CX(s) Applied: B1.3Date: 05/14/2012 Location(s): TennesseeOffices(s): Y-12 Site Office
Protection Upgrades Project CX(s) Applied: B1.3, B1.7, B1.27Date: 05/14/2012 Location(s): TennesseeOffices(s): Y-12 Site Office
Dry Pipe System Sprinkler Piping Replacement Projects CX(s) Applied: B1.3 Date: 05/14/2012 Location(s): Tennessee Offices(s): Y-12 Site Office
Building 8 Compressor Aftercooler Rupture Disc Overflow Piping Project CX(s) Applied: B1.3, B1.15 Date: 05/09/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Big Thompson to Flatiron 13.8 Kilovolt Transmission Line Structure Replacement CX(s) Applied: B1.3 Date: 05/09/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Archer to Ault 230 Kilovolt Transmission Line Structure Replacement, Weld County, Colorado CX(s) Applied: B1.3 Date: 05/09/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Western Area Power Administration and Tri-State Generation and Transmission Association, Inc. Fiber Optic Installation Project From Beaver Creek to Big Sandy Substations Morgan, Washington, and Lincoln Counties, Colorado CX(s) Applied: B1.3 Date: 05/0...