2012 Chemawa District Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 05/21/2012 Location(s): Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration
Routine Monitoring, Maintenance, General Site, and Administrative Actions at the L-Bar, New Mexico, Disposal Site CX(s) Applied: B1.3, B3.1 Date: 05/21/2012 Location(s): New Mexico Offices(s): Legacy Management
Access to Remote Valve Station West Hackberry -2 CX(s) Applied: B1.3 Date: 05/18/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Replace Big Hill Raw Water Intake System Oil Water Separator Tank with Concrete Tank GFE CX(s) Applied: B1.3 Date: 05/18/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Asphalt Repair and Concrete Work Activities at the Grand Junction, Colorado, Disposal Site CX(s) Applied: B1.3 Date: 05/18/2012 Location(s): Colorado Offices(s): Legacy Management
Replace Big Hill RWIS Oil Water Separator Tank with Concrete Tank GFE CX(s) Applied: B1.3 Date: 05/18/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Buried Power Line to 64-SX-3 CX(s) Applied: B1.3, B4.6, B4.12 Date: 05/17/2012 Location(s): Wyoming Offices(s): RMOTC
Wood Pole Replacements As Needed on the Naselle-Tarlett No. 1, Holcomb- Naselle No. 1, and Raymond-Willapa River No. 1, 115 Kilovolt Transmission Lines CX(s) Applied: B1.3 Date: 05/16/2012 Location(s): Washington Offices(s): Bonneville Power Administr...
Replacement of A-Area Critical Fire Hydrant 3038 CX(s) Applied: B1.3 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Re-supply of Electrical Loads Fed from 192-K & 183-3K CX(s) Applied: B1.3 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office