HB-Line Security Upgrades CX(s) Applied: B1.3 Date: 03/18/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
March 18, 2014HB-Line Security Upgrades
CX(s) Applied: B1.3
Date: 03/18/2014
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Security upgrades will be installed at the HB-Line facility, including fencing, access control, and fiber optic motion sensing.
CX(s) Applied: B1.3
Date: 03/18/2014
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Security upgrades will be installed at the HB-Line facility, including fencing, access control, and fiber optic motion sensing.