Hayden Communications Site Tower Removal and Parking Area Grading Routt County, Colorado CX(s) Applied: B1.3, B1.19 Date: 10/01/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Replacement of Deep-Anode Ground Bed Sites for Big Hill Cavern 104 and Site Unit 1 “A”, and BC Cavern 18 CX(s) Applied: B1.3 Date: 10/01/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor Repair of Roof Leaks at 704-3N CX(s) Applied: B1.3 Date: 09/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Chemawa-Salem #1 & #2 Access Roads CX(s) Applied: B1.3 Date: 09/27/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Artesia Tap- Southwest Rangely 138 Kilovolt Transmission Line Danger Tree and Herbicide Treatment for Vegetation Management CX(s) Applied: B1.3 Date: 09/26/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Subcontractor Repair of Roof Leaks at 720-H CX(s) Applied: B1.3 Date: 09/26/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 717-1N CX(s) Applied: B1.3 Date: 09/26/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Driscoll-Naselle #1 Tower Relocation CX(s) Applied: B1.3 Date: 09/26/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Office of Secure Transportation Multiple Actions CX(s) Applied: B1.2, B1.3, B1.11, B1.15 Date: 09/25/2013 Location(s): Tennessee Offices(s): Oak Ridge Office
Subcontractor Repair of Roof Leaks at 735-2B CX(s) Applied: B1.3 Date: 09/25/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office