Remove Failed Waste Transfer Drain Line 1533 CX(s) Applied: B1.3 Date: 11/05/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 703-47A. CX(s) Applied: B1.3 Date: 11/05/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Renovate Radiochemistry Lab B138 CX(s) Applied: B1.3 Date: 11/05/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Modify Savannah River National Laboratory (SRNL) Building 773-A Laboratory C135/139 CX(s) Applied: B1.3 Date: 11/05/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Replacement of Big Hill TX-14 Transformer, Government Furnished Equipment CX(s) Applied: B1.3 Date: 10/31/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor Repair of Roof Leaks at 722-4A CX(s) Applied: B1.3 Date: 10/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 763-52N CX(s) Applied: B1.3 Date: 10/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Oracle Substation - Breaker Support Work CX(s) Applied: B1.3 Date: 10/30/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Renovation of 105-L Women's Restroom CX(s) Applied: B1.3 Date: 10/29/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Replace Potable Water Supply Line: Phase Two (Project Modification) CX(s) Applied: B1.3, B1.16, B1.32 Date: 10/24/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory