Replace B920 Fire Wall Line: Phase Two CX(s) Applied: B1.3 Date: 09/24/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Subcontractor Repair of Roof Leaks at 704-45H CX(s) Applied: B1.3 Date: 09/23/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 705-H CX(s) Applied: B1.3 Date: 09/23/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
COLORA - Cross-Arm Replacement, Structure Numbers 12-3, 12-6 CX(s) Applied: B1.3 Date: 09/23/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Timber Tap to Forest Grove-Keeler #1 Access Roads CX(s) Applied: B1.3 Date: 09/20/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Install One (1) Universal Wiring Drop on West End Wall in the 704-L Cafeteria CX(s) Applied: B1.3 Date: 09/19/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Install Blinds in 704-L Cafeteria CX(s) Applied: B1.3 Date: 09/19/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 773-A, B-Wing CX(s) Applied: B1.3 Date: 09/19/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Port Angeles-Sappho #1 Shelton-Kitsap #4 Access Roads CX(s) Applied: B1.3 Date: 09/19/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Brasada-Harney Number 1 Access Road Maintenance Project CX(s) Applied: B1.3 Date: 09/18/2013 Location(s): Oregon Offices(s): Bonneville Power Administration