Timber Salvage from Pine Ridge Storm Damage CX(s) Applied: B1.3 Date: 09/17/2013 Location(s): Tennessee Offices(s): Oak Ridge Office
Swan Valley-Teton Number 1 and Number 2 Access Road Maintenance CX(s) Applied: B1.3 Date: 09/16/2013 Location(s): Idaho Offices(s): Bonneville Power Administration
Replace Potable Water Supply Lines: Phase Two CX(s) Applied: B1.3, B1.16, B1.32, B2.2 Date: 09/16/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Hebo Substation Access Road Maintenance CX(s) Applied: B1.3 Date: 09/13/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Chehalis-Raymond Number 1 Access Road Maintenance CX(s) Applied: B1.3 Date: 09/13/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Alvey-Lane #1 Transmission Line Access Road Maintenance CX(s) Applied: B1.3 Date: 09/12/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Repair Domestic Water Leak at SFP Facilities CX(s) Applied: B1.3 Date: 09/12/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Bridgeport-Gering 115-Kilovolt Transmission Line Structure Replacement CX(s) Applied: B1.3 Date: 09/12/2013 Location(s): Nebraska, Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region
Subcontractor Repair of Roof Leaks at 749-A CX(s) Applied: B1.3 Date: 09/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Archer-North Park 230-Kilovolt Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 09/10/2013 Location(s): Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region