Bryan Mound-Seaway Pipeline Inspection and Repair CX(s) Applied: B1.3Date: 08/24/2016 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
August 24, 2016Bryan Mound-Seaway Pipeline Inspection and Repair
CX(s) Applied: B1.3
Date: 08/24/2016
Location(s): Multiple Locations
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall furnish all materials, tools, equipment, supplies, transportation, facilities, labor, supervision, and services required to excavate and inspect an external corrosion anomaly on the Bryan Mound to Seaway Freeport Dock 30-inch diameter crude oil pipeline.