The JEOL JSM-6480LV SEM, along with all peripheral attachments, are to be removed and replaced by a new SEM and its needed peripheral attachments
The existing failed BESS inverter will be removed and replaced with a new inverter supplied by a different vendor. This will also require the repl…
Bonneville Power Administration (BPA) proposes to install a new heating, ventilation, and air conditioning (HVAC) system at BPA's Big Eddy Substati…
Replace three diesel power plant silencers (including an improved foundation, structural supports, and protection from the elements) and four radia…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the Massachusetts Institute of Technology (MIT) for the design, deve…
KIUC is relocating, upgrading, and expanding its control room in the Port Allen Generation Station (PAGS). The upgrade will include necessary instr…
The U.S. Department of Energy (DOE) is proposing to authorize the administration of the fourth and final phase (Test Contest) of Round 2 of a prize…
CX-032217: Decarbonizing EAF Steelmaking by Using CO2-Sourced Graphite Electrodes in EAF Steelmaking
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Seerstone Development (Seerstone) for the production of solid carbon…