The 234-H instrument air COPCO compressors have reached their end of service life and are not operational. This EEC is to evaluate the use of porta…
Dake Johnson Band Saw in 711-2N is being excessed due to normal wear and tear and age of equipment. This vertical saw will be replaced with a new v…
The Department of Energy (DOE) Portsmouth/Paducah Project Office (PPPO) proposes to conduct site characterization and monitoring, air and stack effluent monitoring, plant and animal sampling, surface water sampling, and actions including, but not limited to, geological, geophysical, and geochemical investigations, engineering surveys, and mapping.
APC will perform 6 projects across 2 power plants (Amos and Mountaineer) to replace and restore key pieces of power plant infrastructure. Projects …
The project will conduct reliability initiatives at an existing coal-fired power plant, Kyger Creek Station located in Cheshire, OH, including repa…
Perform laboratory development of new membrane electrode assembly materials and stack hardware. Install engineering-scale, 10 kilowatt-electric (k…
The objective of this task is to address existing vulnerabilities in grid-supporting communications infrastructure. 1) Land Mobile Radio (LMR) Netw…
Buckeye Power is proposing the Cardinal Plant Revitalization Project, located at the Cardinal Power Plant in Brilliant, Ohio, which will serve 77 r…
This EEC will serve to cover use of portable Reciprocating Internal Combustion Engines (RICE) powered equipment used to support Liquid Waste facili…
Mount a cabinet to the existing structure and install communication wiring/ conduit within the existing substation rock footprint (12 substations).…