The Department of Energy (DOE) Portsmouth/Paducah Project Office (PPPO) proposes to conduct site characterization and monitoring, air and stack effluent monitoring, plant and animal sampling, surface water sampling, and actions including, but not limited to, geological, geophysical, and geochemical investigations, engineering surveys, and mapping.
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Geothermix, LLC, for the installation,operation, and subsequent remo…
Remove commodities connecting several pieces of N-Area/PMCS shop equipment within the facility, prep for excess. Install new similar-type shop equi…
The Kesselring Site Reverse Osmosis System Overhaul Project will replace the current Reverse Osmosis (RO) system located inside the KS Boiler House with a new water purification system.
This scope of work covers removing/excessing the old Rockwell sander in 711-9N, and installation of a new replacement Powermatic sander.…
Fire Alarm and ENS Control Panel Replacement (Pittsburgh, PA), Fire Alarm and ENS System Upgrade (Albany, OR), Utility Meter Installation (Albany, …
Feasibility and FEED study to scale up processes for converting natural and recycled synthetic graphite ton-scale pilot plant which will culminate …
The overall objective of this research and development (R and D) project is to establish a semi-continuous process for conversion of cerium oxide, …
Removal of equipment originally used by MOX from Building 221-21F to Excess/Salvage - Salvage Yard Transfer Building 741-1N. Preparation includes, …
CX-035390: Replacement of Scanning Electron Microscope (SEM) in Inert Metallography Laboratory (IML)
The JEOL JSM-6460LV Scanning Electron Microscope (SEM), along with all peripheral attachments, are to be removed and replaced with a new SEM. The n…