The Department of Energy (DOE) Portsmouth/Paducah Project Office (PPPO) proposes to conduct site characterization and monitoring, air and stack effluent monitoring, plant and animal sampling, surface water sampling, and actions including, but not limited to, geological, geophysical, and geochemical investigations, engineering surveys, and mapping.
This EEC will serve to cover use of portable Reciprocating Internal Combustion Engines (RICE) powered equipment used to support Liquid Waste facili…
Maintenance will be fabricating a high angle iron frame for a tool cabinet to go in in the L-Area Disassembly Basin.…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Geothermix, LLC, for the installation,operation, and subsequent remo…
Remove commodities connecting several pieces of N-Area/PMCS shop equipment within the facility, prep for excess. Install new similar-type shop equi…
The Kesselring Site Reverse Osmosis System Overhaul Project will replace the current Reverse Osmosis (RO) system located inside the KS Boiler House with a new water purification system.
This scope of work covers removing/excessing the old Rockwell sander in 711-9N, and installation of a new replacement Powermatic sander.…
Fire Alarm and ENS Control Panel Replacement (Pittsburgh, PA), Fire Alarm and ENS System Upgrade (Albany, OR), Utility Meter Installation (Albany, …
Feasibility and FEED study to scale up processes for converting natural and recycled synthetic graphite ton-scale pilot plant which will culminate …
The overall objective of this research and development (R and D) project is to establish a semi-continuous process for conversion of cerium oxide, …