Maintenance will be fabricating a high angle iron frame for a tool cabinet to go in in the L-Area Disassembly Basin.…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Geothermix, LLC, for the installation,operation, and subsequent remo…
Equipment and infrastructure will be upgraded during the first 2 years of the project. Three existing combustion units, the Transport Reactor Demon…
This work includes the modification, construction, installation and operation of equipment at the Wyoming Integrated Test Center (WITC) in Gillette…
Kentucky Utilities Company will install a SCR system to its coal-fired Unit 2 at Ghent Generating Station. The SCR system will be capable of reduci…
This project proposes to install additional fuel storage tanks to continue increasing fuel storage capacity in Iliamna for the Iliamna Newhalen Non…
Remove commodities connecting several pieces of N-Area/PMCS shop equipment within the facility, prep for excess. Install new similar-type shop equi…
The Kesselring Site Reverse Osmosis System Overhaul Project will replace the current Reverse Osmosis (RO) system located inside the KS Boiler House with a new water purification system.
This scope of work covers removing/excessing the old Rockwell sander in 711-9N, and installation of a new replacement Powermatic sander.…
Fire Alarm and ENS Control Panel Replacement (Pittsburgh, PA), Fire Alarm and ENS System Upgrade (Albany, OR), Utility Meter Installation (Albany, …