This project proposes to install additional fuel storage tanks to continue increasing fuel storage capacity in Iliamna for the Iliamna Newhalen Non…
Remove commodities connecting several pieces of N-Area/PMCS shop equipment within the facility, prep for excess. Install new similar-type shop equi…
The Kesselring Site Reverse Osmosis System Overhaul Project will replace the current Reverse Osmosis (RO) system located inside the KS Boiler House with a new water purification system.
This scope of work covers removing/excessing the old Rockwell sander in 711-9N, and installation of a new replacement Powermatic sander.…
Fire Alarm and ENS Control Panel Replacement (Pittsburgh, PA), Fire Alarm and ENS System Upgrade (Albany, OR), Utility Meter Installation (Albany, …
Feasibility and FEED study to scale up processes for converting natural and recycled synthetic graphite ton-scale pilot plant which will culminate …
The National and Homeland Security (N&HS) Wireless Testbed (WTB) Program at the Idaho National Laboratory (INL) performs large-scale, independent, end-to-end research and development (R&D) of next generation communication infrastructure such as cellular phone systems, land mobile radios, emergency communications systems, and wireless local area network (WLAN) systems.
The overall objective of this research and development (R and D) project is to establish a semi-continuous process for conversion of cerium oxide, …
The United States Department of Energy (DOE), Office of Energy Dominance Financing (EDF), may provide loan guarantees for energy infrastructure projects under Section 1706 of Title XVII of the Energy Policy Act of 2005, as amended by the Inflation Reduction Act of 2022 (42 U.S.C. 16517) and the One Big Beautiful Bill Act (Pub. L. No. 119-21, 139 Stat. 72 (July 4, 2025)) (the Energy Dominance Financing or EDF Program).
Removal of equipment originally used by MOX from Building 221-21F to Excess/Salvage - Salvage Yard Transfer Building 741-1N. Preparation includes, …