The Tritium NNSA has requested access control card readers to be installed at the Security Inspections Operations Area (SIOA) Room 103 for entry an…
Diffuser-O2 Monitor Relocation Due to Miscoordination with Y839 Equipment…
The purpose of this project is to remove and replace approximately 300 feet of obstructed sanitary sewer pipe located along Kirk Road at the site b…
Activities include upgrading an existing CDR testbed facility, concurrent multi-pathway CDR testing, process modeling, data compilation and analysi…
The U.S. Department of Energy (DOE) is proposing to authorize the administration of the fourth and final phase (Test Contest) of Round 2 of a prize…
Video Teleconferencing equipment will be relocated between various SRPPF buildings to support transition of building ownership.…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to FirstElement Fuel (FEF) to design, develop, fabricate, and implement…
The CMOSS Switchgear Electrical Power Upgrade and BMOSS Refeed Project supports shifting electrical loads due to current construction activities, future electrical capacity expansions, and upgrades various aspects of the power distribution system.
Installation of a new, redundant electrical feeder line from transmission lines on the west side of I-376 to the southern edge of the Neighborhood …
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform installation or relocation and operation of machinery and equipment (…