Purchase, excavation, construction, and installation of a 5MW/20 MWh battery backup system in Estes Park, Colorado. This will be used to serve 4 cr…
The Bundle Storage (MTR) Rack is Safety Significant Design feature that is located in Section 3 of the Hot Canyon of 221-H. This DCP replaces exist…
A pressure gauge will be installed on an existing air sampling valve on 294-H roof. This will allow pressure of the air space to be measured above …
Provide and install a new Digital Imaging and Measurement System (DIMS). It will be installed on a table within a lead shielded cabinet in the room…
The U.S. Department of Energy (DOE) is proposing to provide funding to the Rincon San Luiseño Band of Mission Indians (Rincon) to deploy three (3) …