The DESC Switchyard at the 681-3G River Pumphouse is being rebuilt due to aging equipment and current site needs.…
The U.S. Department of Energy is proposing to provide funding to the Wisconsin Office of Energy to design and replace the existing geothermal cooli…
Isolation and removal of several pieces of equipment originally used by MOX from Building 226-2F to Building 717-F or to Building 711-1N for storag…
This project will provide a new exhaust system (2 Fans), a small electrical building, a stack, and a new diesel generator for 234-7H and will blank…
The scope of this task will replace the diesel engine and generator and consolidate and or replace the existing 4 Motor Control Centers (MCCs) in B…
Confinement ventilation in the Materials Test Facility (MTF) building 234-7H is maintained by the existing H-Area Old Manufacturing (HAOM) building…
Building 773-50A will be modified to accept the installation of a Techni Abrasive Waterjet Cutting System. The operation of this system involves th…
Stationary Air Compresssors powered by Diesel Generators (RICE) that failed are being replaced with comparable air compressors.…
The TREAT Facility will perform sodium loop testing on engineering-scale experiments scheduled to begin in fiscal year (FY) 2023.…
Proposed activity provides for the procurement and installation of a backup set of Dead Weight Testers in the Building 234-H (HAOM) Hot Calibration…