Thermal Cycle Absorption Process (TCAP) Product Bed C is to be replaced by new components.…
Relocation of the duct detector BE-14 in room 102 to the upstream of the same duct in room 122 will allow access to the duct detector without the u…
To continue to meet the surveillance mission while developing new systems, the installation of the vibration machine in 248-H is imperative and sho…
NNSA will be using the SEM 0202 (Serial No. 71-1216) shredder that they borrowed from Centerra at 713-N.…
Proposed activity installs Oxygen Monitor Model AMII 221R, D-0231 in Lab D-0231 of 773-A.…
The specific objective of the project is to complete design, specification, engineering, procurement, manufacturing, quality assurance, testing, an…
This proposed project will modify the plant protective system (PPS) in Advanced Test Reactor (ATR) to allow operation of lobe powers from 60 MW up …
The project has decided that the use of pole-mounted fiber is better suited for the area.…
The US Department of Energy (DOE) proposes to perform mechanical replacements and/or upgrades of the Advanced Light Source (ALS) switchstation A3 (…
Installation and Operation of LM-1 Degausser and DX-8 Destruction device for fast destruction of hard drives in Building 226-F. …