The U.S. Department of Energy (DOE) is proposing to provide funding to the Alaska Village Electric Cooperative (AVEC) for the installation of a 900…
The DOE Berkeley Site Office (BSO) proposes that LBNL continue conducting ongoing indoor, small- and pilot-scale research and development activitie…
The DOE Berkeley Site Office (BSO) proposes that LBNL continue conducting ongoing outdoor, small and pilot-scale research and development activitie…
This revision provides details on the proposed location for the generators, building modifications, and site plan.…
Install a Larger Air Receiving Tank (about 5000 gallons) for the CPC Purge Air Compressors at 422-S.…
This project will provide a new exhaust system (2 Fans), a small electrical building, a stack, and a new diesel generator for 234-7H and will blank…
Mini-Thermal Cycling Absorption Process (TCAP) components are to be designed and installed into secondary confinement in TEF, and tied in to TEF Di…
The Kesseiring Site Security Lift Gates Replacement Project consists of replacing eight security lift gates at the Kesseiring Site; (6) gates on Atomic Project Road, (1) gate on Hogback Road and (1) gate adjacent to Building 116.
Central Plateau Cleanup Company (CPCCo) and its subcontractors perform installation or relocation and operation of machinery and equipment (includi…
The Ingersoll Rand SSR-XP10 air compressor and Parker Airtek TW25 air dryer, along with the air dryer pre filter and after filter, are to be remove…