Work instructions are to safely install, setup, and anchor the new Bridgeport Milling Machine and accessories in 717-F. Additionally (Rev. 1): Plan…
This project will design, procure, and install a piping system to transfer caustic in bulk quantities to tanks 38-43.…
This action proposes to install new compressors with greater capacity because the existing H Canyon and HB-Line compressors are outdated and expens…
Replace the rigging testing calibration machine at 705-N.…
Modify TRU PAD 4 for additional equipment. System will need electrical power and design support.…
The U.S. Department of Energy (DOE) is proposing to provide funding to the Clean Energy Smart Manufacturing Innovation Institute (CESMII) for DOE's…
Work instructions are to safely install, setup, and anchor the new Bridgeport Milling Machine and accessories in 717-F.…
The US Department of Energy (DOE) proposes to demolish and remove Buildings 56 and 64 from the Lawrence Berkeley National Laboratory (LBNL or Berke…
TCAP Column A, along with TCAP Feed Beds A and B and TCAP Product Bed B and TCAP Deuterium Beds A and B are to be replaced in-kind by new component…
CM 3681: Disconnect Bertsch Plate Roller in 717-1N move it to 717-N iron worker laydown yard for future excess.…