The US Department of Energy (DOE) proposes to perform assessment, modernization, and upgrade of the existing sitewide utility systems at the Lawren…
This proposed activity is to remove two aging process air compressors located inside Section 18 of H Canyon and replace them with two new water-coo…
Relocate Mass Spectrometer system in Room 109 Building 264-H to Building 233-H Room 10.…
The Stratasys Rapid Prototyping Machine was purchased to support research and development.…
Install Tank 15 Annulus to Primary Transfer System.…
KESSELRING SITE MARF DEFUELING AND ASSOCIATED DEFUELING FACILITY PROJECT
Modify TRU PAD 4 for a Real Time Radiography (RTR) system. System will need electrical power and design support.…
Install of Labconco ventless hood and Labconco storage cabinets.…
The U.S. Department of Energy (DOE) proposes to install a temporary tensile (tent-like) structure on the existing demolished Building 7 site to pro…
The US Department of Energy (DOE) proposes to install new diesel power backup generators at LBNL’s Bayview and Fire Protection Complex locations.…