Remove 249-H Refrigerant Storage Transfer System and remove electrical connections from out-of-service (OOS) Refrigerant Recovery Tank outside of 2…
3 HVAC Package units at 713-1N will be replaced.…
Remove HVAC Unit RTU-4 and replace with a new 7.5 ton cooling unit on the roof of Bldg. 704-N.…
Award Number: DE-EE0009242, CX(s) Applied: A9, B1.31, B3.6, Fuel Cell Technologies Office, Location(s): TN, Office(s): Golden Field Office
Prompt Gamma-ray Neutron Activation Analysis (PGNAA) is an extremely useful tool for identifying the presence of various chemical or isotopic compo…
INL uses LDRD investments to accelerate advanced nuclear energy Research, Development, and Demonstration (RD
A Subcontractor shall provide Savannah River Nuclear Solutions (SRNS) Railroad Operations with a locomotive for the planned work scope across the S…
Install and anchor pipe bender at 711-N.…
Central Plateau Cleanup Company (CPCCo) and its subcontractors perform installation or relocation and operation of machinery and equipment.…
The U.S. Department of Energy (DOE) to perform alterations to a building and construct a support structure to house a Large Item Neutron Assay System