Install an Electric Discharge Machine (EDM) in building 234-7H (room 109) that requires a chilled water unit, electrical supply, instrument air sup…
Under this multi-Laboratory project, Argonne will procure and install the following major equipment.…
The Advanced Test Reactor Complex machine shop, building TRA-662, contains old machines/equipment that need to be removed and sent to excess proper…
Oregon State University proposes to develop an experimental database of progressive benchmarks with increasing complexity, to be able to validate s…
Oak Ridge National Laboratory (ORNL) proposes to investigate the lattice strain distribution in silicon carbide (SiC) fuel cladding, subject to neu…
221-33F Relocate air compressor 003.…
Award Number: DE-EE0008368, CX(s) Applied: A9, B1.31, B3.6, Solar Energy Technologies Office, Location(s): NH, Office(s): Golden Field Office
Design and install a new DIMS to be installed in Room 28.…
Install an Electric Discharge Machine (EDM) in building 248-H (machine shop area) that requires a chilled water unit, electrical supply, instrument…
As part of the multi-facility wide effort for the MEDE project, an initial quantitative analysis of selected elements will be tested to verify no r…