This project involves the design, construction, and installation of experimental equipment for the Measurement of a Lepton-Lepton Electroweak React…
At each candidate site for a possible new commercial reactor, DOE proposes to install a 60-meter high lattice or pole meteorological tower, includi…
Knolls Laboratory-Chemistry Laboratory and Radiological Health Facility, Building T3, Construction Project
Install two new pieces of equipment, a Flying Probe Tester and an air compressor in Building 730-A.…
INL will provide network engineering support to operate and maintain WirelessTest Bed Cellular Network capability with multiple technologies and fr…
The purpose of the additional work scope is to design, test, and fabricate expansion joint gland seal to replace the ATR IPT Lower Seal.…
The latest upgrade requirement is to address the, End of Life, Milestone status of the Wireless Test Beds, WTBs, integrated Operation Mediation Sys…
Install Almand Bros. LLC Model Nite-Lite V Series, Serial No. 39007679, Reciprocating Internal Combustion Engine, RICE, Unit, SRSR050572, at291-S …
Two breathing air pass throughs are needed on the exterior walls of 234-7H to allow portable breathing air to be used within Building 234-7H.…
Award Number: DE-EE0009035, CX(s) Applied: A9, B1.31, B1.4, B2.4, B5.1, Federal Energy Management Program, Location: NC, Office: Golden Field Office