Remove the existing B6 HPCF air preheater and replace with an in-kind preheater at the same location. The location is the North side of B6 approxi…
Partially renovate Room B-065 and B-067 to install a Thermal Ionization Mass Spectrometer (TIMS) in the new Ultra High Sensitivity Isotopic Analysi…
The 711-4N Lead Melter Complex includes a lead melter (10,000 lb) and supporting structures (dress-out hut, machining/tooling booth, materialstorag…
The Princeton Plasma Physics Laboratory's (PPPL) proposed Critical InfrastructureRecovery and Renewal (CIRR) project would replace old, degraded sy…
Operation of two water jets in Building 221-33F.…
Award Number: DE-EE0007613, CX(s) Applied: A9, A11, B1.31, B3.6, Advanced Manufacturing Office, Location(s): CA, Office(s): Golden Field Office
Award Number: DE-EE0007472, CX(s) Applied: A9, B1.31, B5.16, State Energy Program, Location(s): IL, Office(s): Golden Field Office
CH2M HILL Plateau Remediation Company (CHPRC) and its subcontractors perform installation or relocation and operation of machinery and equipment (i…
This environmental checklist (EC) covers one experiment module configuration to house the seven fuel pin bundle. This bundle configuration serves a…
The purpose of this revision is to capture additional detail regarding the standard beryllium placed in the I-Loop to moderate neutron flux. The Ad…