Award Number: DE-EE0008916, CX(s) Applied: A9, B1.31, B3.6, Bioenergy Technologies Office, Location(s): FL, Office(s): Golden Field Office
The purpose of this Environmental Checklist (EC) is to address the redesign and installation of the new Advanced Test Reactor (ATR) Low Pressure Ai…
NEPA action levels for planned changes as defined in the Internal Procedure (IP00l)- How to Comply with the National Environmental Policy Act (NEPA…
The scope of this task will replace the diesel engine and generator and consolidate and or replace the existing 4 Motor Control Centers (MCCs) in R…
The Mission Support Contractor (MSC) and its subcontractors perform installation or relocation and operation of machinery and equipment (including,…
The proposed activity of this EC comprises two connected actions: • Replace several aging components of the ATR primary coolant system (PCS), and •…
This activity is to prepare and relocate various equipment from the MCA to off-site and on-site recipients.…
Proposed activity will reconfigure and remodel 226-2F to support use as a training and operations support facility.…
The purpose of this Environmental Checklist (EC) is to address activities at any INL facility, building or structure, either in-town or at the INL …
Install a Wacker Neuson Model G70 (Serial # 24365945) Reciprocating Internal Combustion Engine (RICE) Unit (SRSR50559) at Tank 27F RBA.…