Preparation work on TRU Pad 4 for installation of Non-Destructive Assay (NDA), Non-Destructive Evaluation (NDE), and Flammable Gas Analysis (FGA) e…
The Proposed Activity (PA) is to install temporary modification, 233H-TMC-19-280 via associated WOs 1745994 and 1752113, which would disconnect the…
Install new ATM Saphir 550 polisher/grinder assemblies and laboratory sink in 234-7H and D&R existing Buehler polisher/grinder assemblies. Replace…
The scope of the Upgrade to the Environmental Mechanical Test Facility (EMTF) Infrastructure project is to refurbish a portion of the facility...
The proposed action, funded by Idaho National Laboratory (INL), remodels a laboratory in the Center for Advanced Energy Studies (CAES) to facilitat…
The safe, reliable, and economic operation of the nation's nuclear power reactor fleet has always been a top priority for the U.S. nuclear industry…
As part of the larger site Lab Consolidation effort, F/H Analytical Laboratory (F/HAL) is preparing to transition multiple labs to Inactive or La…
As part of the larger site Lab Consolidation effort, F/H Analytical Laboratory (F/HAL) is preparing to transition multiple labs to Inactive or La…
The U.S. Department of Energy proposes to install a temporary tensile (tent-like) structure in its "Old Town" area to provide centrally located, in…
The further scope includes activities associated with receiving, assembly, testing, storage and shipping of upgrade components in an offsite facili…