Install new ATM Saphir 550 polisher/grinder assemblies and laboratory sink in 234-7H and D&R existing Buehler polisher/grinder assemblies. Replace…
The scope of the Upgrade to the Environmental Mechanical Test Facility (EMTF) Infrastructure project is to refurbish a portion of the facility...
The proposed action, funded by Idaho National Laboratory (INL), remodels a laboratory in the Center for Advanced Energy Studies (CAES) to facilitat…
The safe, reliable, and economic operation of the nation's nuclear power reactor fleet has always been a top priority for the U.S. nuclear industry…
As part of the larger site Lab Consolidation effort, F/H Analytical Laboratory (F/HAL) is preparing to transition multiple labs to Inactive or La…
As part of the larger site Lab Consolidation effort, F/H Analytical Laboratory (F/HAL) is preparing to transition multiple labs to Inactive or La…
The U.S. Department of Energy proposes to install a temporary tensile (tent-like) structure in its "Old Town" area to provide centrally located, in…
The further scope includes activities associated with receiving, assembly, testing, storage and shipping of upgrade components in an offsite facili…
To meet the demands of the Contractor’s customers, periodic upgrades are performed to improve system performance and add additional feature functio…
Replace 218-2H Cooling Water Chemical Injection System. The existing chemical addition system for the 218-2H Cooling Water System is not providing…