The purpose of this Environmental Checklist (EC) is to address activities at any INL facility, building or structure, either in-town or at the INL …
Install a Wacker Neuson Model G70 (Serial # 24365945) Reciprocating Internal Combustion Engine (RICE) Unit (SRSR50559) at Tank 27F RBA.…
Award Number: DE-EE0007897, CX(s) Applied: A9, A11, B1.31, B3.6, Advance Manufacturing Office, Location(s): NY, Office(s): Golden Field Office
Install an Electric Discharge Machine (EDM) in building 234-H that requires a chilled water unit, electrical supply, instrument air supply, de-ioni…
L-Basin High Flux Isotope Reactor (HFIR) Fuel Resin Cleaning Stations…
This work scope is to set-up and operate a newly procured rope saw on the test wall at 666-E prior to utilizing in various areas across the site. T…
Award Number: DE-EE0008644, CX(s) Applied: A9, B2.2, B1.31, B5.1, B5.2, State Energy Program, Location(s): CO, Office(s): Golden Field Office
This revision addresses changes to the original project scope. The size of the proposed has been reduced to about 510 ft2 and will be used to store…
Preparation work on TRU Pad 4 for installation of Non-Destructive Assay (NDA), Non-Destructive Evaluation (NDE), and Flammable Gas Analysis (FGA) e…
The Proposed Activity (PA) is to install temporary modification, 233H-TMC-19-280 via associated WOs 1745994 and 1752113, which would disconnect the…