This activity is to prepare and relocate various equipment from the MCA to off-site and on-site recipients.…
Proposed activity will reconfigure and remodel 226-2F to support use as a training and operations support facility.…
The purpose of this Environmental Checklist (EC) is to address activities at any INL facility, building or structure, either in-town or at the INL …
Install a Wacker Neuson Model G70 (Serial # 24365945) Reciprocating Internal Combustion Engine (RICE) Unit (SRSR50559) at Tank 27F RBA.…
Award Number: DE-EE0007897, CX(s) Applied: A9, A11, B1.31, B3.6, Advance Manufacturing Office, Location(s): NY, Office(s): Golden Field Office
Install an Electric Discharge Machine (EDM) in building 234-H that requires a chilled water unit, electrical supply, instrument air supply, de-ioni…
L-Basin High Flux Isotope Reactor (HFIR) Fuel Resin Cleaning Stations…
This work scope is to set-up and operate a newly procured rope saw on the test wall at 666-E prior to utilizing in various areas across the site. T…
Award Number: DE-EE0008644, CX(s) Applied: A9, B2.2, B1.31, B5.1, B5.2, State Energy Program, Location(s): CO, Office(s): Golden Field Office
This revision addresses changes to the original project scope. The size of the proposed has been reduced to about 510 ft2 and will be used to store…