The U.S. Department of Energy (DOE) is proposing to provide funding to the U.S. Office of Personnel Management (OPM) to increase reliability and en…
Confinement ventilation in the Materials Test Facility (MTF) building 234-7H is maintained by the existing H-Area Old Manufacturing (HAOM) building…
Isolation and removal of HAAS VF 5XT Lathe (DOE 011810) from Building 226-2F to Building 711-1N for storage until lathe is needed in the 717-F mach…
The existing Liquid Nitrogen delivery system for 735-A lab D-007 has failed due to age and deterioration. This work will include replacement of the…
This project would replace identified equipment within the existing Building 12-123 Complex Compressed Air System with new equipment to meet the co…
N and HS personnel will be conducting 500KW generator testing over the course of the next two to three years with approximately 250 hours of operat…
Thermal Cycle Absorption Process (TCAP) Product Bed C is to be replaced by new components.…
Relocation of the duct detector BE-14 in room 102 to the upstream of the same duct in room 122 will allow access to the duct detector without the u…
To continue to meet the surveillance mission while developing new systems, the installation of the vibration machine in 248-H is imperative and sho…
NNSA will be using the SEM 0202 (Serial No. 71-1216) shredder that they borrowed from Centerra at 713-N.…