Mini-Thermal Cycling Absorption Process (TCAP) components are to be designed and installed into secondary confinement in TEF, and tied in to TEF Di…
National Nuclear Security Administration (NNSA)’s proposed action is to 1) create temporary housing for occupancy 2) provide non-occupancy space fo…
National Nuclear Security Administration’s proposed action is to perform the necessary and routine analytical laboratory operation, research and de…
National Nuclear Security Administration’s (NNSA) proposed action is to perform the necessary and routine personnel safety enhancements and safety …
National Nuclear Security Administration’s (NNSA) proposed action is to perform the necessary and routine administrative actions, training exercise…
National Nuclear Security Administration (NNSA)’s proposed action is to perform the routine and necessary waste management, waste minimization, ene…
The scope of the FSVTL and SVTF support facility project includes the construction of a multistory building extension to the north and/or west of the existing SVTF.
Partially renovate Room B-065/B-067 to install a Thermal Ionization Mass Spectrometer (TIMS) in the new Ultra High Sensitivity Isotopic Analysis Fa…
The U.S. Department of Energy (DOE) is proposing to provide funding to Cummins Electrified Power NA Inc. (Cummins) to design, fabricate, install an…
Periodically, Regulatory Monitoring and Bioassay Lab personnel need to relocate P10 gas service panels from one room or lab to another.…