The U.S. Department of Energy (DOE) is proposing to provide federal funding to AECOM for the development, fabrication, and testing of bacteria trea…
Replace the 50 ton chiller (T948-500-10) located inside of Building 249-H.…
Purchase, excavation, construction, and installation of a 5MW/20 MWh battery backup system in Estes Park, Colorado. This will be used to serve 4 cr…
The Bundle Storage (MTR) Rack is Safety Significant Design feature that is located in Section 3 of the Hot Canyon of 221-H. This DCP replaces exist…