The Tritium Finishing Facility (TFF) requires the power feeds to 233-H be re-routed and tapped into the 6A/6B feeders. These feeders also supply th…
Expand and upgrade existing space and services to create a modular testing facility for novel carbon capture technologies…
Confinement ventilation in the Materials Test Facility (MTF) building 234-7H is maintained by the existing H-Area Old Manufacturing (HAOM) building…
The scope of work includes reconfiguring the space for the new use, upgrading the HVAC system, the electrical, lighting systems, and the telecommunication system.
Relocate Delta V servers from 248-H to 264-H.…
The 3D printing Stratasys F120 machine builds plastic pieces from a 3D CAD file. If supports are needed for the model material as it is being built…
This EEC covers various general renovations for buildings 725-N, 725-1N, and 725-2N in Central Shops.…
Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…
This EEC is to cover changing generator SRO5579 to a RICE unit.…
The U.S. Department of Energy (DOE) is proposing to provide funding to the Institute for Advanced Composites Manufacturing Innovation (IACMI, or th…