The facility needs a redesign of the current camera grout hopper lid assembly to ease maintenance activities.…
This EEC is for the relocation of Recycle Vessel Vent (RVV) No. 1 Fan Assembly and RVV No. 2 dampers in H-Canyon Building 292-H per MT-HCA-2021-000…
Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…
The project includes rehabbing an existing building for their project. This building was constructed on an old Brownfield site and is still being m…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to The Board of Trustees of the University of Illinois to research co-l…
The U.S. Department of Energy (DOE) is proposing to provide funding to the Leech Lake Band of Ojibwe (LLBO) to install roof-mounted solar photovolt…
For the Fiscal Year (FY)-24, INL’s LDRD program focuses on the laboratory’s five strategic initiatives: INL’s three emerging core capabilities, one…
This Scope of Work (SOW) provides direction for the installation of an AMI 221R Oxygen (O2) Monitor outside of lab C-118 in building 773-A. Work in…
The Tritium Finishing Facility (TFF) requires the power feeds to 233-H be re-routed and tapped into the 6A/6B feeders. These feeders also supply th…
Expand and upgrade existing space and services to create a modular testing facility for novel carbon capture technologies…