Renovation of Kitchenette in Building 773-51A Room 134.…
The front wall of offices 253 and 254 shall be relocated to the corner of wall of office 219.…
A quonset hut (717-50F) is being built in FTF south of the existing structure 717-30F.…
Building 76 Renovation
Removal and replacement of rain canopies/awnings at the 701-1K and 701-2K entry and/or exits…
New offices will be erected in the 210-S Canister Inspection Area to support operational needs.…
Establishment and operation of a Rapid COVID Testing Station outside of S-Area (Defense Waste Processing Facility).…
The purpose of the proposed action/project is to upgrade the utility systems identified below in the Proposed Action section.…
The scope of the Simulation Development Laboratory/Bettis Reactor Engineering School Project is expected to include the demolition of the existing …
Current facilities at the Advanced Test Reactor (ATR) Complex that house food services, meetings, training space, and administrative and support of…