The scope of the Bettis Atomic Power Laboratory North Campus Utility Corridor Project is to support the existing Fire Water and City Water utility services to the North Campus area, which are currently supplied by a looped system that provides redundant service from two directions in the event of a localized system failure.
LOTUS 2.0 (MFC-1765) is the next development phase of the Laboratory for Operation and Testing in the United States. LOTUS 2.0 will be designed and constructed at the current location of MFC-1727.
Bonneville Power Administration (BPA) proposes to fund upgrades to the chilled water system and supporting infrastructure at the Nez Perce Tribal H…
Bonneville Power Administration (BPA) proposes to construct a new mobile transformer storage building in the J.D. Ross Substation and Regional Oper…
Erect a new coal conveyor transfer tower amongst the existing reclaim coal conveyors. The new coal crushers will replace the existing Bradford Bre…
Idaho National Laboratory (INL) is collaborating with Oak Ridge National Laboratory (ORNL), National Laboratory of the Rockies (NLR), and ArcelorMittal, to establish a National Library for both iron ore and steel scraps.
APC will perform 6 projects across 2 power plants (Amos and Mountaineer) to replace and restore key pieces of power plant infrastructure. Projects …
The Central Alarm Station (CAS) is important for safe and effective operation of the Bettis Site. The CAS houses servers, computers, and monitoring equipment associated with systems to ensure safe operations.
Siting, construction, and operation of an administrative support structure within the K-Area Complex (KAC) at the general area of the K-Area Constr…
Construction of pre-manufactured modular offices at the general northwest outer corner of the 186-K Basin. This space is needed for personnel suppo…