The Kesselring Site Building 107 Refresh Project will address three key building renovation activities: a full-scale roof replacement, roof-top air handler unit replacements, and dust collection system ductwork reconfiguration.
A dedicated laydown area for staging railroad materials south of CFA-633 is required. Although this area was mowed earlier this summer, additional …
Relocate 704-738-K K-Area Interim Surveillance (KIS) Team personnel trailer within the K-Protected Area to the west/adjacent of 704-729K Radiologic…
Bonneville Power Administration (BPA) proposes to fund the Idaho Department of Fish and Game (IDFG) to install two pre-fabricated metal sheds withi…
Building 263-241F is currently an open storage facility originally constructed to support the Waste Solidification Building (WSB) storage requireme…
New RSWF capability/unit to design and install a storage pad for NRIC microreactors post-irradiation. Construction of a storage pad and necessary u…
SEAPA plans to construct a new, supplementary 115kV substation with a 25MVA transformer in a previously disturbed electric utility easement in Ketc…
The Region 3 Radiological Assistance Program (RAP) is designing and constructing a facility to accommodate personnel, equipment, and vehicles for t…
Office trailers and a laydown yard will be installed in the North area of the parking lot near 766-H for the US Army Corps of Engineers (USACE) sub…
The U.S. Department of Energy (DOE) proposes to construct three mobile offices to provide replacement office space and support staff needs at the P…