Cosmetically refurbish the interior of Trailer 704-23G.…
The scope of the Bettis Atomic Power Laboratory North Campus Utility Corridor Project is to support the existing Fire Water and City Water utility services to the North Campus area, which are currently supplied by a looped system that provides redundant service from two directions in the event of a localized system failure.
Recent rains and water damage occurred in the building (760-4G) that requires removal of all interior materials, walls boards, and insulation. The …
The Specific Manufacturing Capabilities Complex (SMC) requires additional administrative office space and a modern high-performance computing cente…
LOTUS 2.0 (MFC-1765) is the next development phase of the Laboratory for Operation and Testing in the United States. LOTUS 2.0 will be designed and constructed at the current location of MFC-1727.
Modular office building installed outside of Entry Control Facility-3 (ECF-3) to support emerging missions in K-Area.…
Existing towers will be refurbished and upgraded with new ACCR (Aluminum Conductor Composite Reinforced) conductors and OPGW (Optical Ground Wire).…
Bonneville Power Administration (BPA) proposes to fund the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to construct an about 60-…
The proposal fits within a class of actions that is listed in Appendix B to 10 CFR Part 1021 or Appendix B and C of DOE’s NEPA Implementing Procedu…
Bonneville Power Administration (BPA) proposes to fund upgrades to the chilled water system and supporting infrastructure at the Nez Perce Tribal H…