Repurposing the Next Generation Solvent (NGS) building at the Salt Waste Processing Facility (SWPF) to store Nitric Acid for the cleaning of the St…
Western Area Power Administration (WAPA) proposes to construct a new Point of Interconnection (POI) at the existing Denison Substation to accommoda…
Tornado shelters shall be installed in various places around F-Area to support the SRPPF project.…
This work includes the modification, construction, installation and operation of equipment at the Wyoming Integrated Test Center (WITC) in Gillette…
Kentucky Utilities Company will install a SCR system to its coal-fired Unit 2 at Ghent Generating Station. The SCR system will be capable of reduci…
The Kesselring Site Building 107 Refresh Project will address three key building renovation activities: a full-scale roof replacement, roof-top air handler unit replacements, and dust collection system ductwork reconfiguration.
Kansas City National Security Campus (KCNSC), KCNSC26-03, the facility will be located at TA-193 and will be a prefabricated indoor shooting range …
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Durion, Incorporated for the development and demonstration of a ther…
Kansas City National Security Campus (KCNSC), KCNSC26-03, the facility will be located at TA-193 and will be a prefabricated indoor shooting range …
Construction of pre-manufactured modular offices at the general northwest outer corner of the 186-K Basin. This space is needed for personnel suppo…