Construction of a new JOULE 3.0 / 2-story Computational Science and Engineering (CSE) facility located in the area where B7, T43 and T45 will be de…
Construction of a new security building in the area across Fumich Avenue from B14. The structure will be no larger than approximately 2500 s.f. and…
Additional trailers (new) are needed to house support staff and equipment to support the mission of the Defense Waste Processing Facility.…
The scope of this project is to construct an annex to the west side of Building 28 to accommodate new test components…
The 701-3H Entry Control Facility into the Tritium Limited Area, LA, is currently an unoccupied space.…
Replace Substation 6 electrical switchgear and associated items-fencing, concrete pad, etc.…
Replace existing B-84 Summer Boiler and associated pumps and controls.…
This project includes replacement of the potable and fire water pipes on the NETL PGH R and D Plateau near the B-95 entrance gate and the Northeast…
INL upgrades, remodels, repairs, and replaces facility and equipment components, assemblies, and systems on a continual basis to support the needs …
Renovate existing first floor space on the north end of the building and construct a two-story building addition for the new Data Center.…