The primary scope of this project is to replace the existing Materials and Fuels Complex (MFC) industrial wastewater pipeline flume with a new flum…
Relocate employees out of trailers to B17, relocate the smoking shelter, prepare the site for removal of trailers, and complete site restoration af…
Establishment and operation of a Rapid COVID Testing Station outside of 735-4B.…
KESSELRING SITE MARF DEFUELING AND ASSOCIATED DEFUELING FACILITY PROJECT
The U.S. Department of Energy (DOE) proposes to install a temporary tensile (tent-like) structure on the existing demolished Building 7 site to pro…
The Kesselring Site D1 G Ditch Remediation Project will remediate soil that is contaminated with silver, mercury, and polychlorinated biphenyls (PCBs), identified in the D1 G Ditch during characterization efforts, to agreed upon cleanup standards.
HMIS Annual Categorical Exclusion (CX) B1.15, Support Buildings for CY 2022…
Modify 717-K Limited Area Pocket…
Per the House of Representatives Appropriations Act, 2020, dated January 2020, a new Protective Force Security Building is being constructed at MFC…
760-1G Mold Mitigation and Asbestos Abatement…