Attach approximately 1,056 square feet of 4’ X 8’ sound absorbing acoustical tiles on walls in Buildings 730-B (Rm 333), 730-2B (10'x20' room) and …
The project proposed the purchase of a 7KW diesel generator rather a 7KW gasoline generator due to durability and higher quality.…
They would now like to proceed with a scaled down version of that brine storage/fill station. …
BPA proposes to fund the Washington Department of Fish and Wildlife (WDFW) to conduct ongoing operations and maintenance of the Scotch Creek Wildli…
BPA proposes to fund the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to conduct ongoing operations and management throughout abo…
J-Building Cryogenic Liquid Bulk Tank Replacement Project
Repair fire/water damage in the high-bay area and portions of the attic and roof in Building 28.…
MFC needs a construction laydown area for construction support for material transfer and equipment staging.…
Small pieces transite material have broken off of exterior surfaces around 105-L and near Steam Station No. 3 Outside Assembly Building.…
This project would expand the productions areas at Ml-8.…