Establish a Rigging Yard/Laydown Area East of 613-J…
Construct a new maintenance building and septic drainage field on existing WAPA-owned land and adjacent to the existing Sioux Falls Substation.…
The Counter Terrorism Operations Support (CTOS) Administration, Warehouse, and Training Office would support CTOS activities on the East Coast, inc…
BPA proposes to construct a new Technical Services Building (TSB), improve road patterns, and add additional vehicle parking at its J.D. Ross Subst…
Due to temperature and moisture extremes, Bldg 6 will be enclosed and environmental controls installed for material quality. …
The Kesselring Site Building 81 Heating, Ventilation and Air Conditioning (HVAC) project consists of replacing the Test, Recording and Monitoring Room, Computer Room, Air Conditioner units, Air Handling Unit (AHU) and Condensing...
This NEPA Amendment consists of the construction and operation of a new aboveground fire water storage tank and pump house.…
Construction of Pre-manufactured Modular Offices and Restroom Building Near CCO Storage Pad, K-Area.…
Relocation of Drive-Thru Rapid COVID Testing Station from B-Area (735-4B) to N-Area (719-5N).…
Install three Willscot 40 ft. X 8 ft. Container Office Combo Units on the concrete pad (No. 710-A), located on the west end of building 730-A.…