The proposed action would permit routine maintenance and minor upgrades to existing Brookhaven National Laboratory facilities.…
The proposed action would include installation, operation, and decommissioning activities necessary to remove the existing fuel station from servic…
It has been requested that a raised concrete pad be installed in the Transport Staging Area at MFC.…
Deploy new training training trailers and restroom trailer near existing S-Area Training Campus at 704-49S (S-Area West and West of 250-S).…
Install two (2) concrete pads for two (2) quonset huts (structure numbers 706-11H and 706-12H) to house craft personnel.…
CX-025330: Removal of Trailer 706-7H, Replacement Trailer Installation (706-8H) in H-Tank Farm (HTF)
This EEC serves to cover the removal of trailer 706-7H within HTF.…
Temporary restroom trailer is to be located West of Trailer 704-49S.…
The Kesseiring Site Security Lift Gates Replacement Project consists of replacing eight security lift gates at the Kesseiring Site; (6) gates on Atomic Project Road, (1) gate on Hogback Road and (1) gate adjacent to Building 116.
Central Plateau Cleanup Company (CPCCo) and its subcontractors perform siting, construction or modification, and operation of support buildings and…
Renovations are needed in Building 246-H. Enhancements will be made to flooring, common areas, and exterior signage.…